A linear-discrete scheduling model for the resource-constrained project scheduling problem

机译:资源受限项目调度问题的线性离散调度模型

获取原文
获取原文并翻译 | 示例
           

摘要

For some specific types of construction projects, the classical CPM or PDM scheduling techniques are not the most suitable. Few specific scheduling approaches have been developed to cope with construction projects that are made of either repetitive activities or activities with linear developments. But real-world construction projects do not consist only of such activities. They are generally made of a mixture of linear and/or repetitive activities and of more conventional activities. To allow this, the linear scheduling problem is reformulated, so classical schedule calculation approaches can be used. The implementation of some Allen's algebra features to avoid adverse discontinuities and to allow crew/work continuity, together with a resource-driven and space-constrained scheduling are among the key features of the proposed approach. It is also a spin-off of off-the-field practices used for scheduling real projects in the particle accelerator construction domain; an excerpt from such a construction project is provided for illustrating the methodology.
机译:对于某些特定类型的建筑项目,经典的CPM或PDM调度技术不是最合适的。很少开发专门的计划方法来应对由重复性活动或线性发展活动构成的建设项目。但是,现实世界中的建设项目并不仅仅包括这些活动。它们通常由线性和/或重复活动与更常规活动的混合物制成。为此,对线性调度问题进行了重新表述,因此可以使用经典的调度计算方法。所提出方法的关键特征包括实现一些艾伦代数特征,以避免不利的不连续性并允许人员/工作连续性,以及资源驱动和空间受限的调度。它也是用于调度粒子加速器构建领域中的实际项目的非现场实践的衍生产品;提供了此类建筑项目的摘录,以说明该方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号