Delays and cost increases in the construction of private residential projects in Kuwait

机译:科威特私人住宅项目建设的延误和成本增加

获取原文
获取原文并翻译 | 示例

摘要

Time-delays and cost-increases associated with the construction of private residential projects in the State of Kuwait are determined. A person-interview survey of 450 randomly selected private residential project owners and developers in 27 representative districts in metropolitan Kuwait formed the database for the study. The socio-economic traits of the owners/developers, and the pre-construction family planning, the design, and the construction phases of the sample projects are presented. Estimates of time-delays and cost-increases are made, and their causes identified. The three main causes of time-delays included changing orders, owners' financial constraints and owners' lack of experience in the construction business. Regarding cost overruns, the three main causes were identified as contractor-related problems, material-related problems and, again, owners' financial constraints. A number of recommendations end the paper. The minimization of time delays and cost overruns in private residential projects would require: the availability of adequate funds, allocation of sufficient time and money at the design phase, and selection of a competent consultant and a reliable contractor to carry out the work.
机译:确定与在科威特州建造私人住宅项目有关的时间延迟和成本增加。对大城市科威特27个代表区的450个随机选择的私人住宅项目所有者和开发商进行的个人访问调查构成了该研究的数据库。介绍了业主/开发商的社会经济特征,以及示例项目的建设前计划生育,设计和施工阶段。估计时间延迟和成本增加,并查明其原因。造成时间延迟的三个主要原因包括订单变更,业主的财务约束以及业主缺乏建筑业务经验。关于成本超支,三个主要原因被确定为与承包商有关的问题,与材料有关的问题以及业主的财务约束。大量建议结束了本文。要最大程度地减少私人住宅项目中的时间延迟和成本超支,需要:提供足够的资金,在设计阶段分配足够的时间和金钱,并选择合适的顾问和可靠的承包商来开展这项工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号