...
首页> 外文期刊>Construction innovation >A scheme design buildability assessment model for building projects
【24h】

A scheme design buildability assessment model for building projects

机译:建筑项目的方案设计可建造性评估模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose - The purpose of this paper is to depict the developmental process of a buildability assessment model for use at the scheme design stage of building projects, which have a priority requirement for functional performance rather than aesthetic performance. Design/methodology/approach - First, major decisions made at the scheme design stage of building projects were identified through pilot interviews and a questionnaire survey on designers. Second, these decisions were rated for their relative importance towards buildability through another questionnaire survey on contractors, analysed using the reliability interval method. Based on these results, a list of buildable and non-buildable features and their impacts is compiled by interviewing major contractors. These findings were incorporated into a modified framework of buildability assessment for complete design, substituting information available at the scheme design stage. Validation was carried out using four sample projects and feedback from practitioners. Findings - The results obtained from the Scheme Design Buildability Assessment Model have been demonstrated as reflective of actual buildability level. Buildable and non-buildable features, as exemplified by typical building projects in Hong Kong Special Administrative Region, have been identified. Originality/value - This is the first model which provides a tool for use by the design team to evaluate the buildability of their designs at an early stage, so that necessary improvements can be made without affecting the development program.
机译:目的-本文的目的是描述在建筑项目的方案设计阶段使用的可建设性评估模型的开发过程,该模型对功能性能而非美学性能具有优先要求。设计/方法/方法-首先,通过试点访谈和对设计师的问卷调查,确定了在建筑项目的方案设计阶段做出的重大决定。其次,通过对承包商的另一份问卷调查对这些决策对可建造性的相对重要性进行了评级,并使用可靠性区间法进行了分析。根据这些结果,通过与主要承包商进行面谈,编制了可构建和不可构建功能及其影响的列表。这些发现被合并到完整设计的可建造性评估框架中,以替代方案设计阶段可用的信息。使用四个样本项目和从业人员的反馈进行了验证。调查结果-从“方案设计可建造性评估模型”中获得的结果已经证明可以反映实际的可建造性水平。以香港特别行政区的典型建筑项目为例,已经确定了可构建和不可构建的功能。原创性/价值-这是第一个提供设计团队用来在早期评估其设计的可构建性的工具的模型,以便可以进行必要的改进而不会影响开发程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号