首页> 外文期刊>Construction equipment >The Sweet Spot Revisited
【24h】

The Sweet Spot Revisited

机译:再探甜点

获取原文
获取原文并翻译 | 示例
       

摘要

I have, for a number of years, been proposing an economic life or sweet spot calculator based on knowing the equation of the cumulative cost curve. Many managers have successfully used it; others are confused by the concept of cumulative cost and have stayed with their current methodologies. Although cumulative cost works, cost per hour life to date (LTD) is the gold standard when it comes to analyzing equipment cost. Here, then, is a methodology for using LTD hourly owning and operating costs to calculate the sweet spot. We'll use some data from a fleet of haul trucks to see how it works. First, collect and plot the data. The unit number, hours worked life to date (LTD), and repair cost LTD data are given in the first three columns of the table below for four of the trucks used in this illustrative example. Several points in the life of each truck were recorded to provide 32 data points.
机译:多年来,我一直在基于累积成本曲线方程的基础上提出一种经济生活或最佳地点计算器。许多管理人员已成功使用它;其他人则对累计成本的概念感到困惑,并且一直使用其当前的方法。尽管累积成本有效,但迄今为止,每小时成本(LTD)是分析设备成本时的金标准。那么,这里是一种使用LTD每小时拥有和运营成本来计算最佳点的方法。我们将使用大量卡车的数据来查看其工作原理。首先,收集并绘制数据。下表的前三列列出了此说明性示例中使用的四辆卡车的单位数量,迄今的工作小时数(LTD)和维修成本LTD数据。记录每辆卡车寿命中的几个点,以提供32个数据点。

著录项

  • 来源
    《Construction equipment》 |2013年第10期|48-49|共2页
  • 作者

    MIKE VORSTER;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:00:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号