首页> 外文期刊>Construction equipment >Are Data Ready For Prime Time?
【24h】

Are Data Ready For Prime Time?

机译:数据准备就绪了吗?

获取原文
获取原文并翻译 | 示例
       

摘要

Although telematics is a word frequently bandied about in the construction industry, a number of fleet managers confess they still don't get it. They remain a little fuzzy on what it is, what it does, and what it is supposed to do to help them make better business decisions. Telematics made its industry debut at Conexpo in 1999. It started out "as a very expensive box that used a variety of sensors to access a telecommunication system," according to Al Cervero, vice president and construction sector leader at the Association of Equipment Manufacturers (AEM).
机译:尽管远程信息处理是建筑行业中经常被提及的一个词,但是许多车队经理承认他们仍然不了解它。他们对它是什么,它做什么以及应该如何做以帮助他们做出更好的业务决策仍然不甚了解。设备制造商协会副主席兼建筑部门负责人Al Cervero表示,Telematics于1999年在Conexpo上首次在行业中亮相。它“起初是一个非常昂贵的盒子,它使用各种传感器来访问电信系统。” AEM)。

著录项

  • 来源
    《Construction equipment》 |2014年第3期|40-42|共3页
  • 作者

    G.C.SKIPPER;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:00:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号