...
首页> 外文期刊>Constraints >A hybrid constraint programming approach to a wood procurement problem with bucking decisions
【24h】

A hybrid constraint programming approach to a wood procurement problem with bucking decisions

机译:具有约束决策的木材采购问题的混合约束规划方法

获取原文
获取原文并翻译 | 示例

摘要

In this article, we present a wood procurement problem that arises in Eastern Canada. We solve a multi-period wood supply planning problem, while taking into account bucking decisions. Furthermore, we present a new form of flexibility which allows the harvesting capacity to change from one time period to another. We study the impact of such flexibility upon the harvesting cost. We assess the performance of the problem by comparing it with a variant where the harvesting capacity is fixed during sites' harvesting. To address this problem, we develop a hybrid approach based on both constraint and mathematical programming. In the first phase, we propose a constraint programming model dealing with forest sites harvesting and bucking problems. The result of this model is used as part of an initial solution for the whole problem formulated as a mixed integer model. We test the two versions of the problem on a set of different demand instances and we compare their results.
机译:在本文中,我们介绍了加拿大东部出现的木材采购问题。我们解决了一个多时期的木材供应计划问题,同时考虑了逆势决策。此外,我们提出了一种新的灵活性形式,使收割能力可以从一个时间段更改为另一个时间段。我们研究了这种灵活性对收获成本的影响。我们通过将问题与现场收割期间固定了收割能力的变型进行比较来评估问题的表现。为了解决这个问题,我们开发了一种基于约束和数学编程的混合方法。在第一阶段,我们提出了一个约束规划模型,用于处理森林站点的采伐和逆伐问题。该模型的结果用作配制为混合整数模型的整个问题的初始解决方案的一部分。我们在一组不同的需求实例上测试问题的两个版本,然后比较它们的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号