首页> 外文期刊>Concrete >Basra Sports City Stadium, Iraq
【24h】

Basra Sports City Stadium, Iraq

机译:伊拉克巴士拉体育城体育场

获取原文
获取原文并翻译 | 示例
           

摘要

Built forthe Iraq Ministry for Sports and Youth, ground works for the impressive new complex, which is set to host the 21st Gulf Cup, commenced on-site in September 2009. Abdullah Al Jiburi General Contracting Company then started bringing in RMD Kwikform Kwikstage and Rapidshor shoring, to support the main concrete construction of the stadium, in January 2010. With thousands of beams, hundreds of columns and numerous slabs for the eight-level, 65,000-seater football stadium required, over 3000 tonnes of equipment were shipped onto site. In addition to RMD Kwikform's Kwikstage and Rapidshor shoring, column, wall and beam formwork, including steel Superslim soldiers and GTX timber beams, were also supplied to the project.
机译:为伊拉克体育和青年部建造的这座令人印象深刻的新综合体的地面工程将于2009年9月在现场开始,该综合体将于21日在墨西哥海湾举行。为支持体育场的主要混凝土建设,在2010年1月进行了支撑。为满足8个层,65,000个座位的足球场的需要,使用了数千根横梁,数百根圆柱和许多平板,现场运送了超过3000吨的设备。除了RMD Kwikform的Kwikstage和Rapidshor支撑外,还向该项目提供了柱,墙和梁模板,包括Superslim士兵钢和GTX木梁。

著录项

  • 来源
    《Concrete》 |2011年第7期|p.22-24|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号