首页> 外文期刊>Concrete >Pumping up the high-rise in Frankfurt
【24h】

Pumping up the high-rise in Frankfurt

机译:法兰克福的高层建筑

获取原文
获取原文并翻译 | 示例
           

摘要

Ed Ziiblin has been contracted for the planning, co-ordination and turnkey completion of the TaunusTurm. The concrete is being delivered by Sehring Beton from Frankfurt. The pumping of the concrete is the job of Godel Beton from Stuttgart, which has extensive expertise in the field of vertical and long-distance pumping, including work on the construction of the new ECB head office in Frankfurt - where the entire concreting has been carried out with Schwing and Stetter equipment. An SP 4800 stationary pump and SPB 35 and SPB 30 separate placing booms are responsible for pumping and placing the concrete for the TaunusTurm project. In all, 70,000m~3 of concrete will be placed during construction.
机译:Ed Ziiblin已与TaunusTurm的规划,协调和总承包合同签订。混凝土由法兰克福的Sehring Beton交付。泵送混凝土是斯图加特的戈德尔·贝顿(Godel Beton)的工作,该公司在垂直和长距离泵送领域拥有丰富的专业知识,包括在法兰克福建设新的欧洲央行总部的工作-整个混凝土浇筑完毕使用Schwing和Stetter设备。 SP 4800固定泵和SPB 35和SPB 30分开的放置动臂负责为TaunusTurm项目泵送和放置混凝土。在施工期间总共将放置70,000m〜3的混凝土。

著录项

  • 来源
    《Concrete》 |2013年第6期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号