首页> 外文期刊>Concrete >Post-tensioning provides the base for 'Tesco Town'
【24h】

Post-tensioning provides the base for 'Tesco Town'

机译:后张紧为“乐购镇”提供了基础

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The design team consists of Sheppard Robson Architects with Walsh Associates providing the structural engineering input, including the post-tensioned design. Such is the scale of the development that Willmott Dixon is combining all three parts of its capital works division (major contracting, house building and interior design and fit-out) to complete the scheme. Widely regarded as one of the largest post-tensioned schemes in the UK today, the scheme's construction will see the consumption of 100,000 tonnes of concrete delivered by 5000 concrete trucks. Five thousand tonnes of reinforcing steel will be required to complete the frame and 85,000m3 of excavated material will need to be removed. However, environmental initiatives will see 50,000 tonnes of demolition material reused.
机译:设计团队由Sheppard Robson Architects和Walsh Associates组成,他们提供结构工程输入,包括后张紧设计。正是这样的发展规模,Willmott Dixon将其资本工程部门的所有三个部分(主要承包,房屋建筑,室内设计和装修)结合起来,以完成计划。该计划的建设被广泛认为是当今英国最大的后张预应力计划之一,其建设将消耗5000辆混凝土卡车运送的100,000吨混凝土。将需要五千吨的钢筋来完成框架,并需要清除85,000立方米的挖掘材料。但是,环保举措将使50,000吨的拆除材料得到再利用。

著录项

  • 来源
    《Concrete》 |2013年第5期|16-18|共3页
  • 作者

    Richard Gaskill;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号