The multi-layered job-shop automatic scheduling system of mould manufacturing for Industry 3.5

机译:工业模具制造的多层工作店自动调度系统3.5

获取原文
获取原文并翻译 | 示例

摘要

This study combined the First In First Out (FIFO) with the Earliest Due Date (EDD) heuristics and the on-site experience of actual production lines. According to such restrictive conditions as the available processing machine groups, the hierarchical relations among components, the due date of moulds as designated in the plan of mould manufacturing, this study conducted a quick analysis with an expert system to determine the optimal sequence and scheduling of machines. The machine management agent was then used for automatic pre-scheduling of the earliest available capacities of the machines to obtain preliminary scheduling. Firstly, the Genetic Algorithm (GA) was used to find the better scheduling sequences. After that, Ant Colony Optimization (ACO) was adopted to optimize the sequence determined by the expert system. It was able to effectively solve the problem of job-shop scheduling featuring a complicated hierarchical procedure for Industry 3.5 as a hybrid strategy between Industry 3.0 and to-be Industry 4.0. Practical mould cases with four-layer components were next used for a comparison of scheduling results. Three case studies show better results with integration of GA and ACO (GA + ACO) than GA or ACO alone. For the in-depth case study of 92 jobs, the scheduling based on the automatic scheduling of EDD spent 8% less work time than that based on FIFO. After the GA and ACO was adopted for the optimization of scheduling, the work span was further shortened by 10% with less computing time.
机译:本研究结合了首次出版社(FIFO),最早的截止日期(EDD)启发式和现场经验的实际生产线。根据这种限制条件作为可用的加工机组,组件之间的分层关系,模具制造计划中的模具的截止日期,本研究与专家系统进行了快速的分析,以确定最佳序列和调度机器。然后,机器管理代理用于自动预先调度机器的最早可用容量以获得初步调度。首先,遗传算法(GA)用于找到更好的调度序列。之后,采用蚁群优化(ACO)来优化专家系统确定的序列。它能够有效解决工地调度的问题,该职业店的行业3.5的复杂分层程序,作为行业3.0和作为行业的混合策略。接下来使用具有四层组分的实用模具盒进行调度结果的比较。三个案例研究表明,GA和ACO(GA + ACO)的整合而不是单独的GA和ACO的效果更好。对于92个工作的深度案例研究,基于EDD自动调度的调度花费了8%的工作时间,而不是基于FIFO。在GA和ACO用于优化调度之后,工作跨度进一步缩短了10%,计算时间较少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号