首页> 外文期刊>Computers & Industrial Engineering >A note on two-stage hybrid flowshop scheduling with missing operations
【24h】

A note on two-stage hybrid flowshop scheduling with missing operations

机译:关于缺少操作的两阶段混合Flowshop调度的说明

获取原文
           

摘要

The scheduling problem in a multi-stage hybrid flowshop has been the subject of considerable research. All the studies on this subject assume that each job has to be processed on all the stages, i.e., there are no missing operations for a job at any stage. However, missing operations usually exist in many real-life production systems, such as a system in a stainless steel factory investigated in this note. The studied production system in the factory is composed of two stages in series. The first stage contains only one machine while the second stage consists of two identical machines (namely a 1 × 2 hybrid flowshop). In the system, some jobs have to be processed on both stages, but others need only to be processed on the second stage. Accordingly, the addressed scheduling problem is a 1 × 2 hybrid flowshop with missing operations at the first stage. In this note, we develop a heuristic for the problem to generate a non-permutation schedule (NPS) from a given permutation schedule, with the objective of minimizing the makespan. Computational results demonstrate that the heuristic can efficiently generate better NPS solutions.
机译:多级混合流水车间中的调度问题已成为大量研究的主题。关于该主题的所有研究均假定必须在所有阶段都处理每个作业,即,在任何阶段都不会丢失作业。但是,许多现实生活中的生产系统(例如,本说明中调查的不锈钢工厂的系统)通常都缺少操作。工厂中研究的生产系统由两个阶段组成。第一阶段仅包含一台机器,而第二阶段则包含两台相同的机器(即1×2混合流水车间)。在系统中,某些作业必须在两个阶段上进行处理,而其他作业仅需要在第二阶段上进行处理。因此,解决的调度问题是在第一阶段缺少操作的1×2混合流程。在本说明中,我们针对该问题开发了一种启发式方法,以根据给定的排列时间表生成非排列时间表(NPS),目的是最大程度地缩短制造周期。计算结果表明,启发式算法可以有效地生成更好的NPS解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号