首页> 外文期刊>Computers and Geotechnics >Load-settlement behaviour of bored piles with loose sediments at the pile tip: Experimental, numerical and analytical study
【24h】

Load-settlement behaviour of bored piles with loose sediments at the pile tip: Experimental, numerical and analytical study

机译:桩端有松散沉积物的钻孔桩的沉降特性:试验,数值和分析研究

获取原文
获取原文并翻译 | 示例
           

摘要

An elevated raft technique is proposed for cast-in-place bored piles, where loose sediments and excavation debris at the pile tip can be compressed by the applied load from the superstructure. The axial load-settlement (i.e., P-S curve) behaviour of bored piles with debris is evaluated by a series of model-scale laboratory experiments. Numerical simulation is conducted using a two-dimensional axisymmetric model for comparison. An analytical model is then proposed to capture the whole P-S curve in three segments: (a) the contribution of skin friction, (b) increased settlement associated with the compression of debris, and (c) the development of tip resistance.
机译:有人提出了一种高架筏技术,用于现浇钻孔桩,在桩端,松散的沉积物和开挖碎屑可以通过上层建筑施加的载荷加以压缩。通过一系列模型规模的实验室实验评估了带有碎屑的钻孔桩的轴向载荷沉降(即P-S曲线)行为。为了进行比较,使用二维轴对称模型进行了数值模拟。然后提出一个分析模型,以捕获三个部分的整个P-S曲线:(a)皮肤摩擦的作用,(b)与碎屑压缩相关的增加的沉降,以及(c)尖端阻力的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号