首页> 外文期刊>Cold regions science and technology >Analysis of avalanche measurements out of the runout area of NGI's full-scale test-site Ryggfonn
【24h】

Analysis of avalanche measurements out of the runout area of NGI's full-scale test-site Ryggfonn

机译:NGI全面测试站点Ryggfonn超出径流范围的雪崩测量分析

获取原文
获取原文并翻译 | 示例
           

摘要

The paper summarizes measurements and observations of dry-snow avalanches at the Ryggfonn test-site with respect to their behavior in the runout area. Measurements of front velocities and retarding accelerations are presented and their probability distributions are deduced. These distributions are then used in Monte-Carlo simulations to supplement measurements of the runout distances and to evaluate the effectiveness of a catching dam in the runout area. The comparison between simulations with and without dam shows the limitation of earth walls as a mitigation measure when they are not placed close to the expected natural runout.
机译:本文总结了在Ryggfonn试验场上的干雪崩在跳动区域的行为的测量和观察。给出了前速度和减速加速度的测量值,并推导了它们的概率分布。然后,将这些分布用于蒙特卡洛模拟中,以补充径流距离的测量值,并评估径流区域中捕获大坝的有效性。有坝和无坝的模拟之间的比较表明,当土墙未放置在预期的自然跳动附近时,土墙的限制是缓解措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号