首页> 外文期刊>Cold regions science and technology >The role of hydro-peaking in freeze-up consolidation events on regulated rivers
【24h】

The role of hydro-peaking in freeze-up consolidation events on regulated rivers

机译:水位峰值在调节河流冻结冻结固结事件中的作用

获取原文
获取原文并翻译 | 示例
           

摘要

Periods of rapid frazil production followed by sudden warming can instigate the consolidation of a developing river ice cover. Although empirical evidence suggests that hydro-peaking operations can also precipitate or exacerbate such events, little is actually known about the specific implications of hydro-peaking during ice cover development because, until recently, numerical ice process models could not simulate such events reliably. Nevertheless, given that fluctuating water levels can destabilize a fragile developing ice cover, resulting in a severe freeze-up ice jam and associated flooding, winter is typically a time of severely constrained flow-peaking operations for hydro-power facilities. The Peace River in northern Alberta presents just such a case; the river has been regulated for hydro-power production since 1972 and numerous consolidation events have been documented along the river over the past few decades, including a particularly extreme event in January 1982. As a consequence of that event, voluntary flow controls have since been implemented each winter during the ice cover development period. In this study, recently developed hydrodynamic ice process modeling tools are used to diagnose such events in order to explore the relative importance of the causative factors and to facilitate a more comprehensive understanding of this phenomenon. Based on this analysis, it appears that meteorological factors may play an equally important role as hydro-peaking in precipitating ice cover consolidation events.
机译:快速的巴西生产和突然变暖的时期可能会促使不断发展的河冰覆盖层巩固。尽管经验证据表明,水峰运行也可能加剧或加剧此类事件,但实际上人们对冰盖发展过程中水峰的具体影响知之甚少,因为直到最近,数值冰过程模型仍无法可靠地模拟此类事件。然而,考虑到水位的波动会破坏脆弱的冰盖的稳定性,从而导致严重的结冰结冰和随之而来的洪水泛滥,冬季通常是水力发电设施水力峰值运行受到严重限制的时期。阿尔伯塔省北部的和平河就是一个例子。自1972年以来,该河就一直受到水电生产的监管,并且在过去的几十年中,沿河记录了无数次固结事件,包括1982年1月的一次极端事件。由于这一事件,自那时以来,人们一直在进行自愿流量控制。在冰盖开发期间的每个冬季实施。在这项研究中,最近开发的水动力冰过程建模工具被用于诊断此类事件,以探究成因因素的相对重要性并促进对这一现象的更全面理解。基于此分析,似乎气象因素可能在诱发冰盖固结事件方面与水峰一样重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号