The China-Russia Crude Oil Pipeline (CRCOP) traverses 441-km-long permafrost zones in northeastern China. Since the pipeline operation in 2011, significant ground surface subsidence occurred within the trench of the pipeline in warm and ice-rich permafrost zones. Oil temperatures from three pump stations were obtained and the soil temperatures around the pipe at two cross sections along the CRCOP in Jiagedaqi, northeast China were monitored during the period from 2011 to 2017. With the date records, permafrost thawing and thaw bulb development around the pipe were investigated in this study, as well as the cooling effect of thermosyphons experimentally installed around the pipe. Results showed that the mean monthly oil temperature ranged from 0.4 to 17.9 degrees C and increased slowly with operation time increase. Due to thermal effect of the warm oil, the artificial permafrost table near the pipe was approximately 5.9 m greater than that in the natural ground 5 years after pipeline operation. A thaw bulb developed around the pipe and expanded at a rate of more than 1.0 m/a in depth. Following the permafrost thawing, ground subsidence around the pipe was significant. The buried depth of the pipe declined with a rate of approximately 0.35 m/a during the study period. To mitigate the permafrost thawing and the pipe settlement, a pair of thermosyphons were experimentally installed at the two sides of the pipe in March 2015. After 2 years of installation, the shallow foundation soils were cooled down and the thaw bulb was partially re-frozen. However, there was still a thawed layer beneath the pipe. Long-term thermal regime of foundation soils under the cooling effect of the thermosyphons needs further investigation.
机译:中俄原油管道(CRCOP)穿越中国东北部441公里长的多年冻土带。自2011年管道运营以来,温暖和富含冰层的多年冻土层管道沟槽内发生了明显的地面沉降。获得了三个泵站的油温,并在2011年至2017年期间监测了中国东北加格达奇CRCOP沿两个断面的管道周围的土壤温度。在这项研究中,对管道进行了研究,并研究了安装在管道周围的热虹吸管的冷却效果。结果表明,平均每月油温在0.4至17.9摄氏度之间,并且随着运行时间的增加而缓慢增加。由于暖油的热效应,管道附近的人工多年冻土层比管道运行5年后的天然地面大约5.9 m。解冻球在管道周围发展,并以超过1.0 m / a的深度膨胀。多年冻土融化后,管道周围的地面沉降明显。在研究期间,管道的埋深以大约0.35 m / a的速率下降。为了减轻多年冻土的融化和管道沉降,于2015年3月在管道的两侧实验安装了一对热虹吸管。安装2年后,将浅层基础土壤冷却下来,将融化球囊部分重新冻结。但是,管道下面仍然有融化的层。在热虹吸管的冷却作用下,基础土壤的长期热状态需要进一步研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号