首页> 外文期刊>Civil Eengineering >Integration of quality control and base improvement in auger piles
【24h】

Integration of quality control and base improvement in auger piles

机译:螺旋钻桩质量控制与基础改良的整合

获取原文
获取原文并翻译 | 示例
           

摘要

Restrictions imposed by new health and safety legislation have limited the efficiency and potential capacity of open-hole auger piles cast in situ. This can be overcome through the use of either base-grouting or steel tubes to maximise the capacity generated by any single pile.rnBase-grouting should be used for smaller piles, improving the material at the base and preloading the pile base to improve the compatibility between the displacements necessary to generate the side shear resistance and the end bearing resistance. Steel tubes can be fitted in piles of larger diameter, which can be used to facilitate quality control, improve the conditions at the base of the pile or install dowels to improve the tension or shear resistance in the pile.
机译:新的健康与安全法规所施加的限制限制了现场浇铸裸眼螺旋钻桩的效率和潜在能力。可以通过使用底部灌浆或钢管来最大化单个桩产生的承载力来克服这一问题.rn对于较小的桩,应该使用底部灌浆,以改善桩基的材料并预加载桩基以提高兼容性在产生侧向剪切阻力和端部轴承阻力所需的位移之间。钢管可安装在较大直径的桩中,可用于促进质量控制,改善桩底条件或安装销钉以提高桩中的抗拉强度或抗剪强度。

著录项

  • 来源
    《Civil Eengineering》 |2009年第3期|40-45|共6页
  • 作者

    Trevor Green;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号