Underpass Roadworks Rehabilitation of Hoy, Griffith and Eric Streets between the Underoass and Bessie Street

机译:Underoass和Bessie街之间的Hoy,Griffith和Eric街地下通道修Road工程

获取原文
获取原文并翻译 | 示例
           

摘要

Before 2010 the St Helen's Rock Pump Station was providing an average of 54 Me per day of raw water to the Bhobhoyi Water Works. Today, the pump station is providing an average of 66 Me per day through the off-channel storage dam into the treatment works with a maximum capability of 82 Me per day. The new Umzimkhulu off-channel storage dam holds almost a billion litres of raw water and is maintained at full capacity. This three year project was completed despite the difficult technical and logistical challenges of working within the confines of a 1973 functioning facility constructed into a weathered rock face.
机译:在2010年之前,St Helen的岩石泵站平均每天为Bhobhoyi水厂提供54 Me的原水。如今,泵站每天平均通过外储水库提供66 Me,最大处理能力为每天82 Me。新的Umzimkhulu海上水坝蓄水近十亿升,并保持满负荷运转。尽管在建于风化岩壁上的1973年正常运行的设施范围内进行工作时遇到了困难的技术和后勤挑战,但这个为期三年的项目还是得以完成。

著录项

  • 来源
    《Civil Engineering》 |2013年第11期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号