...
首页> 外文期刊>Civil Engineering >San Diego Water Agency Will Build 100 mgd Treatment Plant
【24h】

San Diego Water Agency Will Build 100 mgd Treatment Plant

机译:圣地亚哥水务局将建造100 mgd处理厂

获取原文
获取原文并翻译 | 示例

摘要

To keep pace with the growing demand for water in its service area, the San Diego County Water Authority (sdcwa) has decided to build a 100. mgd (378,500 m~3/d) water treatment plant at one go rather than construct the facility in two 50 mgd (189, 250 m~3/d) phases, as had been considered previously. "Uncertainty" regarding its ability to supply adequate amounts of treated water in the near future prompted the authority to pursue building the Twin Oaks Valley Water Treatment Plant all at once, says Tim Suydam, P.E., the project manager for the sdcwa.
机译:为了跟上服务区域对水的不断增长的需求,圣地亚哥县水务局(sdcwa)决定一次性建造100. mgd(378,500 m〜3 / d)的水处理厂,而不是建造该设施如之前所考虑的,分两个50 mgd(189,250 m〜3 / d)阶段进行。 sdcwa的项目经理Tim Suydam,P.E.说,“在不久的将来它能否提供足够量的经过处理的水的能力方面的”不确定性”促使当局立即着手建设双橡树谷水处理厂。

著录项

  • 来源
    《Civil Engineering 》 |2005年第4期| p.25-26| 共2页
  • 作者

    Jay Landers;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号