What Is the Threshold for 'Pass-through' Liquidated Damages?

机译:“通过”违约赔偿金的门槛是什么?

获取原文
获取原文并翻译 | 示例
           

摘要

In the face of lengthy project delays, legal disputes often arise over the ubiquitous liquidated damages clause contained in most construction contracts. Because owners are unable to predict, prior to project commencement, the amount and extent of damages that would result from a delay in completion, contractors typically agree to pay a fixed daily sum in the event of a delay. Prudent contractors also "flow down" these types of provisions in their subcontracts, giving them the ability to require a subcontractor to pay its pro rata share of the liquidated damages attributable to the subcontractor's delay. But there is an interesting question that can sometimes arise: can a contractor collect liquidated damages from a subcontractor if the owner has not assessed them against the contractor? This month's case, Costello Construction of Maryland, Inc. v.J.D. Long Masonry, helps answer that question.
机译:面对长期的工程延误,大多数建筑合同中普遍存在的违约赔偿金条款经常引起法律纠纷。由于业主无法在项目开始之前预测因竣工延误而造成的损失的金额和程度,因此承包商通常同意在发生延误的情况下支付固定的每日金额。谨慎的承包商还会在其分包合同中“流转”这些类型的规定,使他们有能力要求分包商按比例分担因分包商的延误造成的违约赔偿金。但是有时会出现一个有趣的问题:如果业主未对承包商进行违约赔偿,承包商可以向分包商收取违约金吗?本月的案件是马里兰州Costello Construction公司诉J.D.龙工,帮助回答这个问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号