首页> 外文期刊>Civil Engineering >Renovations To Historic London Church Add Underground Levels
【24h】

Renovations To Historic London Church Add Underground Levels

机译:伦敦历史教堂的翻新工程增加了地下层

获取原文
获取原文并翻译 | 示例
       

摘要

Renovations to one of London's most historic churches-St. Martin-in-the-Fields-have added new underground levels, a new entrance pavilion, and a light well to bring natural illumination into the new underground spaces and have restored and refurbished the appearance of both the interior and exterior of the church itself. Located near Trafalgar Square, St. Martin's, as the church is known, receives more than 700,000 visitors annually for worship, concerts, educational programs, and community charitable services at its various buildings. The visitors also include a significant number of tourists. The renewal project began in 2002 with competitions to choose both the architecture and the engineering firms. Construction commenced in January 2006, and the final work was being completed at press time. The project closed the church to the public for five months in 2007; other public areas were closed for eight months.
机译:伦敦历史最悠久的教堂之一-St.田野马丁(Martin-in-the-Fields)增加了新的地下楼层,新的入口凉亭和照明井,以将自然照明引入新的地下空间,并修复和翻新了教堂本身的内部和外部外观。圣马丁教堂位于特拉法加广场(Trafalgar Square)附近,众所周知,该教堂每年在其不同建筑物上接待700,000多名游客,用于礼拜,音乐会,教育计划和社区慈善服务。访客还包括大量的游客。这项更新项目始于2002年,当时竞赛中选择了建筑公司和工程公司。工程于2006年1月开始,截至发稿时,最后工作已完成。该项目在2007年对公众关闭了五个月的教堂。其他公共区域关闭了八个月。

著录项

  • 来源
    《Civil Engineering》 |2008年第11期|p.12-14|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

  • 入库时间 2022-08-18 00:07:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号