Government Sues A/E Firm for Cost Escalation Caused By Late Delivery Of Design Package

机译:政府起诉A / E公司因延误设计包而导致成本上升

获取原文
获取原文并翻译 | 示例
           

摘要

Most architecture and engineering (A/E) firms conducting business with the federal government are familiar with the limitation on funding (LOF) contract clause in the Federal Acquisition Regulation entitled Design within Funding Limitations. Under this clause, the A/E firm agrees to design a structure that can be built within a certain price limit. Although the LOF clause is not frequently litigated, the A/E firm ostensibly has liability to the government if its design yields bids from third parties that exceed the construction funding limit.
机译:与联邦政府开展业务的大多数建筑和工程(A / E)公司都熟悉《联邦采购条例》中题为“在资金限制内进行设计”的资金限制(LOF)合同条款。根据该条款,A / E公司同意设计一种可以在一定价格范围内构建的结构。尽管LOF条款不经常提起诉讼,但如果A / E公司的设计产生的第三方出价超出了建设资金限额,则表面上对政府负有责任。

著录项

  • 来源
    《Civil Engineering》 |2012年第3期|p.92|共1页
  • 作者单位

    Capital Project Strategies, LLC, Res ton, Virginia;

    Briglia McLaughlin, PLLC, Vienna, Virginia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号