首页> 外文期刊>Civil Engineering >Construction of the Northern Areas Sewer - Phase 2
【24h】

Construction of the Northern Areas Sewer - Phase 2

机译:北部地区下水道的建设-第二阶段

获取原文
获取原文并翻译 | 示例
       

摘要

The NAS2 was designed with an optimal gradient, and constructed with strictly enforced tolerances in terms of longitudinal levels, which would ultimately allow a large volume of sewage to be conveyed by gravity with little to no capital or operations and maintenance costs for more than 50 years. The alignment of the NAS2 also made it possible for one of the CCT's smaller sewage pump stations to be decommissioned as the flow could be discharged directly into the new sewer. It is estimated that the NAS2 will ultimately serve a population of over 200 000 people across a large area of Cape Town, and will also facilitate development in the catchment area.
机译:NAS2的设计具有最佳的坡度,并且在纵向高度方面具有严格执行的公差,这最终将使重力输送大量污水,而在50多年内几乎没有资本或几乎没有运营或维护成本。 NAS2的对准还使得CCT较小的污水泵站之一可以退役,因为流量可以直接排入新的下水道。据估计,NAS2最终将为开普敦大片地区的20万人提供服务,还将促进集水区的发展。

著录项

  • 来源
    《Civil Engineering》 |2016年第10期|30-31|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:06:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号