首页> 外文期刊>Civil Engineering >Improvements to Ballito Interchange (km 6.66) on National Route 2 Section 27
【24h】

Improvements to Ballito Interchange (km 6.66) on National Route 2 Section 27

机译:国家2号线第27条对Ballito立交的改进(6.66公里)

获取原文
获取原文并翻译 | 示例
       

摘要

Sanral appointed SMEC South Africa in 2009 for improvement works to the Ballito Interchange, situated 45 km north of Durban. The upgrading of this interchange became necessary due to capacity limitations and poor operational efficiency at the existing interchange configuration. The original scope of services for improvements to the Ballito Interchange included signalising the existing ramp terminals, as well as the design and construction of a single-loop ramp for the east-to-north right-turn movement. To accommodate the envisaged loop ramp, the western bridge jackspan required reconstruction.
机译:Sanral在2009年任命了SMEC南非公司对位于德班以北45公里的Ballito立交所进行了改善工程。由于容量限制和现有交换配置的较差的运行效率,必须升级此交换。改善Ballito交汇处的原始服务范围包括向现有坡道终端发出信号,以及为东到北右转运动的单回路坡道设计和建造。为了适应设想的环路坡道,需要对西部桥梁的顶棚进行改造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号