首页> 外文期刊>Civil Engineering >RAPID REPLACEMENT
【24h】

RAPID REPLACEMENT

机译:快速更换

获取原文
获取原文并翻译 | 示例
           

摘要

As the number of bridges in need of repair or re- placement continues to grow, the search for a cost- effective solution becomes increasingly important. In the field of retaining walls, the use of structures employing mechanically stabilized earth or geosyn- thetic reinforced soil (GRS) approaches has helped to decrease costs. As it happens, concepts from these technologies can also be applied to bridges, saving money and reducing construction time. In the first such project in the state of Delaware, a two-lane bridge nearing the end of its design life was replaced with what is known as a GRS integrated bridge system (IBS). Developed by the Federal Highway Administration (FHWA), this system yields a composite bridge structure featuring GRS abutments and prefabricated bridge superstructure elements.
机译:随着需要维修或更换的桥梁数量的不断增长,寻找具有成本效益的解决方案变得越来越重要。在挡土墙领域,采用采用机械稳定土或土工加筋土(GRS)方法的结构有助于降低成本。碰巧的是,这些技术的概念也可以应用于桥梁,从而节省资金并减少了施工时间。在特拉华州的第一个此类项目中,接近其设计寿命的两车道桥被称为GRS集成桥系统(IBS)所取代。该系统由联邦公路管理局(FHWA)开发,产生了具有GRS基台和预制桥梁上部结构元素的复合桥梁结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号