...
首页> 外文期刊>Civil Engineering >City of Cape Town New Water Programme
【24h】

City of Cape Town New Water Programme

机译:开普敦市新水计划

获取原文
获取原文并翻译 | 示例

摘要

The Steenbras wellfield forms part of theCCT’s New Water Programme, which willenhance water security during droughtevents. The approach followed during theplanning and implementation phases wasguided by the philosophy that the protectionof the environment must be prioritised,while also protecting basic humanneeds. Therefore, although the Steenbrasarea is a declared nature reserve, the implementationof various measures enabledadaptive environmental management toreduce the impact of the developmenton the environment. For instance, thesemeasures included full-time monitoringby Environmental Control Officers onsite, Environmental Method Statementapproval processes, and continual inputby environmental and rehabilitation specialists. This assisted in the ongoingpursuit of environmental best practice.
机译:Steenbras Wellfield形成了部分 CCT的新水计划将会 加强干旱期间的水安全 事件。 遵循的方法 规划和实施阶段是 以保护的理念为指导 环境必须优先考虑, 同时也保护基本人类 需要。 因此,虽然斯滕布拉斯 区域是一个宣布的自然保护区,实施 启用各种措施 自适应环境管理 减少发展的影响 关于环境。 例如,这些 措施包括全职监控 由环境管理人员进行 网站,环境方法陈述 批准过程,持续输入 由环境和康复专家。 这是在进行中辅助的 追求环境最佳实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号