THE following is general guidance relating to cost issues and identifies best practice in avoiding potential disputes before they occur. Problems occur when assessing whether people who are engaged in a project but are not site-based should be charged to the project. On New Engineering Contract (NEC) projects, this is dealt with by defining the working area which may expand to areas other than a contained project site. Careful consideration of where people will be working must be given from the outset and clearly defined in the contract, because the default is that they are included within the fee and so will not form part of the actual/defined cost. Where it is uncertain from the outset, ensure there is a mechanism whereby the project manager agrees to extend the working area prior to incurring any cost.
机译:以下是与成本问题有关的一般指导,并在发生之前识别避免潜在争端的最佳实践。 在评估从事项目的人但不是以网站为基于基于网站的人进行问题发生问题。 在新工程合同(NEC)项目中,通过定义可能扩展到所载项目现场以外的区域的工作区域来处理这一点。 仔细考虑人们将从一开始就可以从一开始就是在合同中授予,因为违约是它们在费用中包含,因此不会形成实际/定义的成本的一部分。 从一开始就不确定,确保有一种机制,项目经理同意在发生任何成本之前扩展工作区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号