首页> 外文期刊>Civil Engineering Surveyor >The application of liquidated damages when a contract is terminated
【24h】

The application of liquidated damages when a contract is terminated

机译:合同终止时适用违约金

获取原文
获取原文并翻译 | 示例
       

摘要

THE recent Court of Appeal decision in Triple Point Technology inc v PTT Public Co Ltd (2019) EWCA Civ 230 provides guidance on the application of damages when a contract is terminated or abandoned. Clients who were caught out by the Carillion collapse and the recent Dawnus collapse read on! But first a bit of background. The case in the first instance, Triple Point Technology, Inc v PTT Public Company Ltd (2017) EWHC 2178 (TCC) was handed down on 23 August 2017. Triple Point Technology is a company incorporated in the State of Delaware. Its business included the design, development and implementation of software for use in commodities trading. PTT Public Company Limited is a company incorporated in Thailand, which undertakes commodities trading.
机译:最近的上诉法院在Triple Point Technology Inc诉PTT Public Co Ltd(2019)EWCA Civ 230中的判决为终止或放弃合同时适用损害赔偿提供了指导。被Carillion倒闭和最近的Dawnus倒闭所吸引的客户继续阅读!但是首先要有一些背景知识。一审案件于2017年8月23日宣告Triple Point Technology,Inc诉PTT Public Company Ltd(2017)EWHC 2178(TCC)。Triple Point Technology是在特拉华州注册成立的公司。其业务包括用于商品交易的软件的设计,开发和实施。 PTT Public Company Limited是在泰国注册成立的公司,从事商品贸易。

著录项

  • 来源
    《Civil Engineering Surveyor》 |2019年第5期|34-35|共2页
  • 作者

    Bill Edwards;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:23:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号