By any measure, the Narragansett Bay Commission's (NBC) Combined Sewer Overflow (CSO) Tunnel was a large, demanding project comprised of several risky elements, and included some considerable challenges, delays and disputes involving ground freezing, shaft construction, excavation and support of a large rock cavern, tunnelrnboring machine (TBM) mining and adit excavation by blasting.
机译:无论如何,纳拉甘塞特湾委员会(NBC)的下水道溢流(CSO)联合隧道是一个庞大而苛刻的项目,包含多个风险要素,并且包括一些相当大的挑战,延误和纠纷,涉及地面冻结,竖井施工,开挖和支护大型岩洞,隧道掘进机(TBM)开采和爆破平整开挖。