首页> 外文期刊>Chinese Journal of Mechanical Engineering >STUDY AND PRACTICE ON ELIMINA-TING OVERCONSTRAINT TO REDUCE SENSITIVITY TO ERROR IN BLAST FURNACE TAPHOLE DRILL
【24h】

STUDY AND PRACTICE ON ELIMINA-TING OVERCONSTRAINT TO REDUCE SENSITIVITY TO ERROR IN BLAST FURNACE TAPHOLE DRILL

机译:消除过高约束降低高炉火炬钻头误差敏感性的研究与实践

获取原文
获取原文并翻译 | 示例
           

摘要

Aimed at bad robustness of taphole drill of 1 200 m~3 blast furnace in a iron and steel works, overconstraint of the mechanism is analyzed, which is closed-chain six-bar mechanism. Then its structure design to eliminate overconstraint is discussed, and non-overconstraint basic links combinations and their configuration pattern are presented, combined with working characteristic and movement precision requirement of taphole drill, desired configuration pattern is selected. In this way, the machine runs smoothly, its efficiency is high.
机译:针对钢铁厂1200 m〜3高炉出铁口钻头坚固性差的问题,分析了该机构的过度约束,即闭链六连杆机构。然后讨论了消除过度约束的结构设计,提出了非过度约束的基本连杆组合及其构型,结合出铁孔钻的工作特性和运动精度要求,选择了理想的构型。这样,机器运行平稳,效率高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号