...
首页> 外文期刊>ZKG International >Progress tracking from the engineering phase to the construction site
【24h】

Progress tracking from the engineering phase to the construction site

机译:从工程阶段到施工现场的进度跟踪

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

From the engineering and manufacturing phase to the final construction site, the entire machinery, e.g. roller mills for raw material or cement plants, passes through many stages. This is why order processes in plant engineering and construction are often very complex and require the co-operation and interaction of several different departments. The Duesseldorf/ Germany based Loesche GmbH has in this regard developed a tracking system for their clients that can track the status of orders at any time.%Von der Entwicklung über die Herstellung bis hin zum Aufbau am endgültigen Standort durchlaufen maschinentechnische Anlagen wie Rohstoffwälzmühlen oder Zementwerke viele Stationen. Bestellprozesse im Anlagenbau sind daher häufig sehr komplex und fordern die Zusammenarbeit verschiedener Abteilungen.
机译:从工程和制造阶段到最终施工现场,整个机器,例如用于原料或水泥厂的辊磨机需要经过许多阶段。这就是为什么工厂工程和建设中的订单流程通常非常复杂,并且需要多个不同部门的合作和互动的原因。在这方面,总部位于德国杜塞尔多夫的德国Loesche GmbH已为他们的客户开发了跟踪系统,该系统可以随时跟踪订单状态。%机械工程系统(例如原料辊磨机或水泥厂)从开发到最终安装和制造都要经过很多站。因此,工厂工程中的订购过程通常非常复杂,需要不同部门的合作。

著录项

  • 来源
    《ZKG International》 |2012年第10期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号