...
首页> 外文期刊>CEAS Space Journal >Implementation of concurrent engineering to Phase B space system design
【24h】

Implementation of concurrent engineering to Phase B space system design

机译:并发工程到B相空间系统设计的实施

获取原文
获取原文并翻译 | 示例
           

摘要

Concurrent engineering (CE) has been in use within the space industry since the mid-1990s for the development of robust, effective design solutions within a reduced period of time; to date, however, such applications have focussed on Phase 0/A feasibility studies, with the potential for application in later phases not yet demonstrated. Applications at the DLR Institute of Space Systems have addressed this gap with practical attempts made on three satellite projects. The use of Phase 0/A CE techniques, such as dedicated CE sessions, online trade-offs, and design iterations and consolidation, was taken and augmented with more novel practices such as online requirements engineering. Underlying these practices was a suite of tools coming from both external and internal sources. While it is noted that the traditional time and cost benefits expected from Phase 0/A use are less likely to be achieved for Phase B applications, the resulting solutions demonstrated an increased robustness and performance.
机译:自1990年代中期以来,并行工程(CE)一直在太空工业中使用,以在较短的时间内开发出强大而有效的设计解决方案。但是,迄今为止,此类应用已集中在阶段0 / A可行性研究中,尚未证实在以后阶段中的应用潜力。 DLR空间系统研究所的应用程序通过三个卫星项目的实际尝试解决了这一差距。采取了阶段0 / A CE技术,例如专用的CE会话,在线权衡,设计迭代和合并,并采用了更多新颖的做法,例如在线需求工程。这些做法的基础是来自外部和内部来源的一套工具。注意,对于阶段B应用,不太可能实现使用阶段0 / A带来的传统时间和成本收益,但最终的解决方案却显示出更高的鲁棒性和性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号