...
【24h】

Will the water last out?

机译:水会持续吗?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Following a dry start to the year, the first water-saving restrictions on canal use this summer have been put in place - but supplies to most of the British Waterways system are holding out so far.rnWorst affected on the BW system is the Leeds & Liverpool Canal, where four flights of locks around the summit - Gargrave, Bank Newton, Greenberfield and Barrowford locks -are only open from 10am to 6pm until further notice.rnOn the Kennet & Avon, locks 54 and 55 at either end of the summit are restricted to 9am to 4pm. However BW says this is a temporary problem resulting from a number of cases of paddles left open, and hopesrnto attend to this in the short-term by additional backpumping. In the longer term, improvements to the capacity of the backpumping systems are planned for this winter.
机译:在今年开始干旱之后,今年夏天对运河的首次节水限制已经到位-但迄今为止,英国大部分水运系统的供水仍未解决。对BW系统影响最严重的是利兹利物浦运河(Liverpool Canal)在山顶周围有四个锁闸-加格雷夫(Gargrave),牛顿银行(Bank Newton),格林伯菲尔德(Greenberfield)和巴罗福德(Barrowford)锁仅在上午10点至下午6点开放,直到另行通知为止。仅限上午9点至下午4点。但是BW表示,这是一个暂时性的问题,原因是许多桨叶未打开,因此希望在短期内通过增加反向抽水来解决这个问题。从长远来看,计划在今年冬天提高后泵系统的容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号