...
首页> 外文期刊>Canal boat and inland waterways >Full T&M reopening put back until May
【24h】

Full T&M reopening put back until May

机译:全面的T&M重新开放时间推迟到5月

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Breach At Dutton which closed the north end of the Trent & Mersey Canal last September is now expected to take until May to repair. Although major engineering work got under way in January following planning and access road construction, the nature of the material used for construction of the embankment proved to be less suitable for re-use than had been hoped.
机译:去年9月关闭了特伦特和默西运河北端的达顿突破口现在预计要到5月才能修复。尽管计划和通道建设之后,1月份进行了重大工程工作,但事实证明,用于筑筑路堤的材料的性质不如预期的那样适合再利用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号