...
【24h】

After the flood...

机译:洪水过后...

获取原文
获取原文并翻译 | 示例

摘要

After the rain comes the clean-up - and for the Canal & River Trust, it's a £2m operation including some serious engineering work. But, as we went to press, it looked hopeful that the entire system would be open by Easter, with the exception of the biggest single problem on the Monmouthshire & Brecon Canal at Llanfoist. Canal Boat spoke to CRT's Operations Director Vince Moran who reported that the work at Llanfoist is "progressing quite well" -but there's a lot to do. The rain-sodden embankment started to slide down the steep hillside that the canal runs along, opening up a large crack along the canalside. The response has been to 'nail' the embankment back to the underlying bedrock with 10-metre and 20-metre long 'pins'.
机译:雨后的清理工作-对于Canal&River Trust而言,这是一项200万英镑的运营,包括一些认真的工程工作。但是,在我们付印之时,我们希望整个系统能够在复活节之前开放,除了Llanfoist的Monmouthshire&Brecon运河上最大的单个问题之外。 Canal Boat与CRT的运营总监Vince Moran进行了交谈,后者报道Llanfoist的工作进展“相当顺利”-但是还有很多工作要做。雨水冲刷的路堤开始沿着运河所沿着的陡峭山坡滑下,在运河沿岸开辟了一条大裂缝。对此,人们做出了反应,用10米和20米长的“大头钉”将路堤“钉”回下面的基岩。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号