...
首页> 外文期刊>Canal boat and inland waterways >Rochdale finally set to open
【24h】

Rochdale finally set to open

机译:罗奇代尔终于开张了

获取原文
获取原文并翻译 | 示例

摘要

The rochdale canal finally has a target for complete reopening - nine months after the Boxing Day floods closed its eastern length and the adjacent Calder & Hebble Navigation. A reopening in early July saw the first boats through the partially completed Elland Bridge (pictured) which had been damaged so badly that it needed to be demolished and rebuilt. This opened up the final section of the Calder & Hebble but left two remaining closures on the Rochdale.
机译:在节礼日洪水关闭其东部长度和邻近的Calder&Hebble Navigation九个月后,罗奇代尔运河终于有了一个完全重新开放的目标。 7月初重新开放,第一批船穿过部分完工的Elland桥(如图所示),损坏严重,以至于需要拆除和重建。这打开了Calder&Hebble的最后部分,但在Rochdale上留下了两个关闭处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号