...
【24h】

Facelift for BCN bridges

机译:BCN桥梁改型

获取原文
获取原文并翻译 | 示例
           

摘要

Thanks to donations from members of the public through the Friends of the Canal & River Trust, three of the Birmingham Canal Navigations' well recognised cast iron canal bridges are being given a facelift as part of a £130,000 eight-week repair and maintenance project. The Trust plans to restore Icknield Square Junction Bridge, Rotton Park Junction Bridge and Lea Bridge, all of which are located on the BCN Main Line between Birmingham and Smethwick. Each of the bridges will have the old paintwork removed, areas of rust and damage carefully repaired and then several coats of specialist paint applied. The brick and sandstone walls supporting the bridges will also be repaired and graffiti, which has been sprayed along the bridge sides and on the walls, will also be removed.
机译:多亏了通过运河与河流信托之友的公众捐款,伯明翰运河通航的三座公认的铸铁运河桥进行了整修,这是一项耗资13万英镑的为期八周的维修和保养项目的一部分。基金会计划修复艾肯尼德广场交界处的桥梁,罗顿公园交界处的桥梁和利娅桥,所有这些都位于伯明翰和史密斯威克之间的BCN主线上。每座桥梁都将去除旧油漆,仔细修复生锈和损坏的区域,然后涂几层专业油漆。支撑桥梁的砖墙和砂岩墙也将得到修复,沿着桥梁两侧和墙壁喷涂的涂鸦也将被清除。

著录项

  • 来源
    《Canal boat and inland waterways》 |2016年第5期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号