...
首页> 外文期刊>Canal boat and inland waterways >Floods: re-openings on the way
【24h】

Floods: re-openings on the way

机译:洪水:在途中重新开放

获取原文
获取原文并翻译 | 示例

摘要

The first significant lengths of the waterways which suffered major damage in the Boxing Day floods are on track to open by Easter - but it will be summer at the earliest before all routes are navigable again. The main routes hit by the breaches, bridge damage, towpath washouts, cutting slips, canal wall damage and heavy silting were the Rochdale Canal, Calder & Hebble Navigation and Aire & Calder Navigation. Following the start of dredging and repair work, CRT is 'confident' that an eight-mile isolated length from Hebden Bridge on the Rochdale via the junction at Sowerby Bridge to Salterhebble on the Calder & Hebble will re-open by Easter. On the Rochdale Canal heading further west, another three miles of dredging should see it open to Lock 15 by early May. Beyond there, it gets more difficult with a major landslip into the canal and a breach.
机译:在节礼日洪水中遭受严重破坏的水道的第一批重要路段有望在复活节前开放-但最早要到夏季,所有路线才能再次通航。受到破坏,桥梁损坏,行人路过冲,切割滑移,运河壁面损坏和严重淤积的主要路线是罗奇代尔运河,卡尔德和希伯尔航海以及艾尔和卡尔德航海。在疏and和维修工作开始之后,CRT确信从Rochdale的Hebden桥到Sowerby桥的交界处到Calder&Hebble的Salterhebble的八英里隔离长度将在复活节之前重新开放。在向西行驶的罗奇代尔运河上,到3月疏of又有3英里的疏should,预计它将在5月初向15号闸开放。除此之外,由于主要的山体滑坡和运河的通行,难度变得更大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号