首页> 外文期刊>Canal boat and inland waterways >New canal length takes shape
【24h】

New canal length takes shape

机译:新的运河长度初具规模

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In the gloom underneath a supermarket goods delivery yard on the edge of Birmingham, a new canal length is taking shape - but the Lapal Canal Trust needs another £700,000 to turn it into an extension of the national network.After a decade of changing plans for a former industrial site close to where the abandoned Lapal Canal meets the Worcester & Birmingham Canal, construction of a supermarket and student accommodation development is almost complete, with the new Sainsbury's storeopened in early December. As part of the work, the section of Lapal Canal underneath the delivery yard is being built by developers, and the canal's new route through the site has been reserved as a 'greenway'. The plan is to turn this into a canal channel, extending into Selly Oak Park to make an attractive short arm with visitor moorings and turning basin - and to form the first step towards Lapal Canal Trust's eventual aim of complete reopening of the canal.
机译:在伯明翰边缘的一家超市的货场下面的一片阴暗中,一条新的运河正在形成-但拉帕尔运河信托需要另外70万英镑才能将其变成国家网络的扩展。塞恩斯伯里(Sainsbury)的新店于12月初开业,以前是一个工业园区,靠近废弃的拉帕尔运河(Lapal Canal)与伍斯特(Worcester)和伯明翰(Birmingham)运河的交汇处,超市和学生公寓的开发几乎已经完成。作为工作的一部分,开发人员正在建造交付场下方的拉帕尔运河部分,而运河穿过该地点的新路线被保留为“绿道”。该计划将把它变成一条运河通道,延伸到塞利奥克公园(Selly Oak Park),以制作一条吸引人的短臂,带有访客的系泊设备和转向盆地-并朝着拉帕尔运河信托(Lapal Canal Trust)最终彻底开放运河的最终目标迈出第一步。

著录项

  • 来源
    《Canal boat and inland waterways》 |2019年第2期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号