...
【24h】

A three-way bridge for MK

机译:MK的三通桥

获取原文
获取原文并翻译 | 示例

摘要

Following on from our aerial picture last month of the new Campbell Park Marina in Milton Keynes taking shape, a remarkable new three-legged footbridge has now been craned into place at the marina entrance. The steel bridge, with a span of 31 metres, bridges both the entrance to the marina and the main line of the Grand Union Canal. Its designers COWI/Knight Architects say that it "provides two connections within one structure while avoiding any abrupt changes in direction that would be difficult for cyclists and wheelchair users to navigate". It was fabricated in sections off-site, assembled at the marina, and lifted into place in a single piece by marina builder Land & Water using a 750-tonne crane.
机译:继上个月我们在空中拍摄的米尔顿凯恩斯新的坎贝尔公园码头成形后,如今,在码头入口处已经吊装了一座引人注目的新三足人行桥。这座钢桥跨度达31米,既通往码头入口,又通往大联合运河的干线。它的设计师COWI / Knight Architects说,“它在一个结构中提供了两个连接,同时避免了方向的突然改变,这对于骑自行车的人和轮椅使用者来说是很难导航的”。它是在场外进行分段制造的,在码头上组装,然后由码头制造商Land&Water使用750吨起重机将其吊装到位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号