Prophet River First Nation v. British Columbia (Minister of the Environment)

机译:先知河第一民族诉不列颠哥伦比亚省(环境部长)

获取原文
获取原文并翻译 | 示例

摘要

Environmental law-Statutory protection of environment - Miscellaneous-Proponent's proposed project of dam hydroelectric generating station went through joint federal and provincial environmental assessment - Joint Review Panel determined that project had clear benefit of producing power with much less greenhouse gases but would likely cause significant adverse environmental effects affecting current traditional use of land and resources by First Nations holding treaty rights - Minister of Environment and Minister of Forests, Lands and Natural Resources Operations issued environmental assessment certificate to proponent, setting out conditions intended to avoid or reduce potentially significant adverse effects - First Nations' petition applying for judicial review was dismissed - Trial judge found First Nations' arguments that Ministers' decision to issue certificate was unreasonable were based on selected and incomplete references to record before Ministers - Trial judge found panel recommendation about carrying out comprehensive cumulative effects study was not specific to this particular project - Trial judge found arguments called for re-weighing of such record that could not properly be done on judicial re-view - Trial judge found Ministers' decision was polycentric exercise of wide discretion, entitled to high degree of deference - Trial judge found issues raised by First Nations did not more than suggest that it would have been open to Ministers to reach different conclusion that might have been more in keeping with some of views expressed by Panel - Trial judge found First Nations failed to demonstrate that Ministers proceeded without reasonable basis - First nations appealed, seeking declaration that Ministers were obliged to determine whether project would constitute unjustifiable infringement of treaty rights before deciding to issue certificate - Appeal dismissed - Ministers were not exercising quasi-judicial statutory authority so could not determine constitutional questions - Issues of treaty infringement, like issues of Aboriginal territorial claims, are not determined by ministers of Crown - Ministers also not required to determine whether project constituted unjustifiable treaty infringement before issuing certificate, as it was not within their statutory mandate and, they did not have means to make proper determination.
机译:环境法-环境的法定保护-杂项支持者的拟议中的大坝水电站项目已通过联邦和省级联合环境评估-联合审核小组确定该项目具有明显的好处,即发电量少得多的温室气体,但可能会造成严重不利影响拥有条约权利的原住民影响当前传统上对土地和资源的传统使用的环境影响-环境部长和森林,土地及自然资源运营部长向支持者颁发了环境评估证书,列出了旨在避免或减少潜在的重大不利影响的条件-原住民提出的要求进行司法审查的请愿被驳回-审判法官认为原住民关于部长决定颁发证书的决定不合理的论点是基于部长们选择和不完整的备案记录-审判法官发现专家组重新审理对开展综合累积效应研究的称赞并非特定于该特定项目-审判法官发现需要重新称重这种记录的论点,而这些记录在司法审查中是无法正确完成的-审判法官发现部长的决定是对政府的多中心行使广泛的酌处权,应得到高度的尊重-审判法官认为,第一民族提出的问题仅表明部长们可以得出不同的结论,而该结论可能更符合小组的某些观点-审判法官发现原住民未能证明部长们没有合理的理由继续进行选举-原住民提出上诉,要求宣布部长有义务在决定签发证书之前确定该项目是否构成对条约权利的不合理侵犯-上诉被驳回-部长没有行使准权利司法机构,因此无法确定制度上的问题-条约侵权的问题,如土著领土主张的问题,不是由官方的部长确定的-部长也不需要在颁发证书之前确定项目是否构成不合理的条约侵权,因为这不在其法定任务范围之内,并且没有办法做出适当的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号