Subsurface Utility Engineering-Reducing Risk on Construction Projects

机译:地下公用工程-减少建设项目的风险

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

What is one of the biggest risks on construction projects? The Unknown. And what is a common unknown on construction projects? The exact location, size and presence of Underground Utilities. Professional engineers, working with public and private infrastructure systems and projects, all too often encounter unexpected costs and delays due to inaccurate or incomplete utility drawings. Typically, the responsibility for providing accurate utility information is passed around from utility to owner to consultant to contractor. It is a problem that is not unique to Canada, it is common throughout North America and the world. We do not have accurate and reliable utility records that show the exact location of our underground utility infrastructure, and yet this information is crucial for increasing efficiency, reducing costs, and improving safety on construction projects. Examples of this problem are evident across the country every day, and it is time to come up with a solution.
机译:建设项目的最大风险之一是什么?未知。在建设项目中什么是普遍的未知数?地下公用事业的确切位置,大小和存在。与公用和专用基础结构系统和项目一起工作的专业工程师常常会因公用工程图不正确或不完整而遇到意想不到的成本和延误。通常,提供准确的公用事业信息的责任从公用事业到所有者再到顾问再到承包商。这不是加拿大独有的问题,在整个北美和全世界都很普遍。我们没有准确可靠的公用事业记录来显示地下公用事业基础设施的确切位置,但是该信息对于提高效率,降低成本和提高建筑项目的安全性至关重要。这个问题每天在全国各地都有明显的例子,是时候提出解决方案了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号