首页> 外文期刊>Bulletin >Cost Factors in Geothermal Production of Electricity
【24h】

Cost Factors in Geothermal Production of Electricity

机译:电力地热发电的成本因素

获取原文
获取原文并翻译 | 示例
           

摘要

The life cycle costs of a geothermal power project through production of electricity include exploration to find the area for development, acquisition of the area of interest, development of energy supply facilities, and construction and operation of the generation plant—including the integral cost of environmental control facilities. For a geothermal power plant to be financially competitive with fossil-fuel power plants requires integrated control of both the timing and the size of expenditures until electricity is produced for the customer.
机译:通过发电生产的地热发电项目的生命周期成本包括:寻找可开发区域的勘探,收购感兴趣的区域,能源供应设施的开发以及发电厂的建设和运营,包括环境的整体成本控制设施。为了使地热发电厂与化石燃料发电厂在财务上具有竞争力,需要对支出的时间和规模进行综合控制,直到为客户发电为止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号