...
首页> 外文期刊>Bulletin of engineering geology and the environment >Analysis and prediction of land subsidence along significant linear engineering
【24h】

Analysis and prediction of land subsidence along significant linear engineering

机译:大型线性工程沿土地沉降的分析与预测

获取原文
获取原文并翻译 | 示例
           

摘要

Land subsidence along significant linear engineering is mainly affected by long-term over-extraction of groundwater, mining of mineral resources, and karst collapse. In this paper, combined with the engineering geological and hydrogeological conditions, a three-dimensional fluid-solid model of land subsidence is established based on groundwater seepage and Biot's consolidation theories, in order to analyze and forecast the evolution law of the groundwater and land subsidence. The numerical results are verified using field monitoring data (InSAR and high-precision level measurement results). On the basis of monitoring and numerical results, the induced factors and distribution characteristics of land subsidence along the high-speed railway line are determined. According to different groundwater exploitation schemes, the development and evolution laws of ground subsidence in the future are predicted to analyze the influence of ground subsidence on high-speed railway line. The results suggest that (1) the main influencing factors of land subsidence in DK306 similar to DK313 and DK411 similar to DK414 sections are groundwater over-extraction, while DK276 similar to DK279 section is coal mining, DK368 similar to DK372 section requires a special research; (2) the decrease of land subsidence rate and differential subsidence are shown to be nonlinear with the reduction of groundwater withdrawal; (3) under the same mining conditions of groundwater, the land subsidence rate and differential subsidence are declining with time; (4) the surface differential subsidence is obviously sensitive to groundwater exploitation.
机译:沿着重要线性工程的土地沉降主要受到地下水的长期过度提取,矿产资源开采和喀斯特崩溃的影响。本文结合工程地质和水文地质条件,基于地下水渗流和BIOS的整合理论建立了三维流体固体模型,以分析和预测地下水和土地沉降的演变法。使用现场监控数据(INSAR和高精度测量结果)验证数值结果。在监测和数值结果的基础上,确定了沿着高速铁路线陆地沉降的诱导因子和分布特性。根据不同地下水开采计划,预计未来地面沉降的发展和演化法则分析了地面沉降对高速铁路线的影响。结果表明(1)类似于DK313和DK411类似于DK414段的DK306的地面沉降的主要影响因素是地下水过度提取,而DK276类似于DK279部分是煤矿,类似于DK372的DK368需要一个特殊的研究; (2)土地沉降率和微分沉降的降低显示为非线性,降低地下水退出; (3)在地下水的同一采矿条件下,土地沉降率和微分沉降随着时间的推移而下降; (4)表面微分沉降对于地下水开采显着敏感。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号