首页> 外文期刊>Bulletin of engineering geology and the environment >Evolution of anti-liquefaction performance of foundation soils after dam construction
【24h】

Evolution of anti-liquefaction performance of foundation soils after dam construction

机译:大坝建设后基础土抗液化性能的变化

获取原文
获取原文并翻译 | 示例
       

摘要

This research examines the foundation of a 7-year-old reservoir dam. No anti-liquefaction reinforcement treatment was applied before or during dam construction because the designers believed that the overburden load of the levee improved the soil liquefaction resistance. Here, we reassess the anti-liquefaction performance of the foundation and evaluate the reinforcement effect of the levee overburden load. Standard penetration tests and cone penetration tests were conducted to assess and compare the liquefaction potential of the foundation soils before and after the dam construction to reveal the evolution of anti-liquefaction performance. The confining pressure and relative density of the liquefiable soils were obtained before and after dam construction. Laboratory resonant column tests and dynamic triaxial tests were conducted under different confining pressures to obtain the dynamic properties of the soils before and after dam construction and the evolution mechanism of the anti-liquefaction performance of the foundation soils.
机译:这项研究检查了一个有7年历史的水库大坝的基础。大坝建造之前或期间没有进行抗液化加固处理,因为设计者认为堤坝的超载提高了土壤的抗液化性。在这里,我们重新评估了基础的抗液化性能,并评估了堤坝上覆荷载的加固效果。进行了标准渗透试验和圆锥渗透试验,以评估和比较大坝建造前后的地基土液化潜力,以揭示抗液化性能的演变。在建造大坝之前和之后都获得了可液化土壤的围压和相对密度。在不同的围压下进行了实验室共振柱试验和动态三轴试验,获得了大坝建造前后土壤的动态特性以及基础土抗液化性能的演化机理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号