...
首页> 外文期刊>Bulk materials international >New bauxite mine for Guinea...
【24h】

New bauxite mine for Guinea...

机译:几内亚的新铝土矿...

获取原文
获取原文并翻译 | 示例

摘要

The first train has taken bauxite from the new UAE-owned Guinea Alumina Corporation (GAC) mine in Guinea to the established mining port of Kamsar. In the first instance, 80-wagon trains are each carrying 6,800t of bauxite ore from the mine to the company's storage facility at Kamsar. All rail infrastructure on the project has been completed, including rail loops and a spur line to join the existing 90 km multi-user mining line that runs between Sangaredi and Kamsar. The number of trains operating on the route is to increase to up to six a day, and production is expected to peak at 12 Mtpa. Total project .development costs are estimated at US$1.4B.
机译:第一列火车将铝土矿从几内亚的阿联酋新拥有的几内亚氧化铝公司(GAC)矿山运送到已建立的Kamsar矿山港口。首先,从矿山到公司在Kamsar的存储设施的80列火车,每列载有6,800吨铝土矿。该项目的所有铁路基础设施均已完成,包括铁路环路和支线,以连接在Sangaredi和Kamsar之间运行的现有90公里多用户采矿线。这条路线上运行的火车数量将增加到每天六列,预计产量将达到12 Mtpa。项目的总开发成本估计为$ 1.4B。

著录项

  • 来源
    《Bulk materials international》 |2019年第janaafeba期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号