...
【24h】

Big upgrade for Nacala

机译:纳卡拉大升级

获取原文
获取原文并翻译 | 示例

摘要

Work on the US$273M upgrade of the coal port of Nacala has begun. A new round of dredging will allow access for larger vessels, and a 1 km access road and 400m quay are being built. Nacala has mainly been developed as a coal export port, and the new coal terminal at Nacala-a-Velha will be able to handle 18 Mtpa when it is completed. A joint venture of Sacyr Somague Mocambique and Teixeira Duarte has been awarded the main construction and engineering contract on the project, which is worth US$123.2M and will run for three years.
机译:纳卡拉煤炭港口耗资2.73亿美元的升级工作已经开始。新一轮的疏ging将允许大型船只进入,并且正在修建一条1公里的道路和400m码头。纳卡拉主要发展为煤炭出口港口,完工后,位于纳卡拉-维哈(Nacala-a-Velha)的新煤炭码头将能够处理18 Mtpa。 Sacyr Somague Mocambique和Teixeira Duarte的合资企业已获得该项目的主要建设和工程合同,合同价值1.232亿美元,为期三年。

著录项

  • 来源
    《Bulk materials international》 |2018年第novaadeca期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号