【24h】

Double trouble

机译:双重麻烦

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Mozambique's rail and port operator Caminhos de Ferro do Mocambique (CFM) has reported that the cost of redeveloping the Sena Railway, which runs from Tete Province to the Indian Ocean port of Beira, will be twice as high as previously estimated. In common with all of the country's railway lines, the Sena route was damaged during Mozambique's long civil war but is now in the process of being rehabilitated. A contract for most development work has been given to Rites Group of India, although CFM has already carried out a small amount of work itself.
机译:莫桑比克的铁路和港口运营商Caminhos de Ferro do Mocambique(CFM)报道说,重建从塞特铁路到太洋省贝拉港的塞纳铁路的费用将是先前估计的两倍。与莫桑比克的所有铁路线一样,塞纳(Sena)路线在莫桑比克漫长的内战期间遭到破坏,但目前正在恢复之中。尽管CFM本身已经进行了少量工作,但已将大多数开发工作的合同授予了印度Rites Group。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号