首页> 外文期刊>Bulk materials international >Not all gloom and doom for engineers
【24h】

Not all gloom and doom for engineers

机译:对于工程师而言,并非一帆风顺

获取原文
获取原文并翻译 | 示例
           

摘要

In February this year China's Sinoma Engineering Interna tional Co Ltd commissioned Bedeschi Group SpA, based in Padova, to supply two limestone storage sections and one shale storage section for the Ibese cement plant of Dangote Cement Works in Nigeria.rnConstruction work on this new plant, located at Yewa North in Nigeria's Ogun state, began last June, following an agreement reached between Sinoma and Dangote in February 2008 that looked to construction of seven new cement lines in Nigeria and Senegal.rnThe scale of the deal was cut back, however, in December and for the time being only three of the projects are going ahead, including Ibese.rnEach limestone storage section at Tbese will have a capacity of 41,580 m~3 with stacking capacity of 1550 t/ h and reclaiming capacity of 600 t/ h. The shale store will have a capacity of 9300 m~3, with a stacking rate of 1550 t/h and a reclaim rate of 60 t/h. Delivery of material is scheduled for February 2010.
机译:今年2月,中国中材国际工程有限公司委托位于帕多瓦的Bedeschi Group SpA为尼日利亚Dangote水泥厂的Ibese水泥厂提供了两个石灰石储存段和一个页岩储存段。该公司位于尼日利亚奥贡州Yewa North,于2008年2月达成协议,希望在尼日利亚和塞内加尔建设7条新水泥生产线。该协议于2008年2月达成。 12月,目前只有3个项目在进行中,包括Ibese。rnTbese的每个石灰石存储段的容量为41,580 m〜3,堆积量为1550 t / h,回收能力为600 t / h。页岩库的容量为9300 m〜3,堆积速度为1550吨/小时,回收速度为60吨/小时。计划于2010年2月交付材料。

著录项

  • 来源
    《Bulk materials international》 |2009年第117期|7-8|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号