...
【24h】

Fortescue on the up

机译:上的Fortescue

获取原文
获取原文并翻译 | 示例

摘要

Western Australia's For-tescue Metals Group achieved a new export benchmark in September, thanks to an overall lift in operational productivity that has left it confident it can achieve a 55mtpa run rate with existing port and rail in-frastructure.rnDuring September the company loaded more ships and exported more ore than in any other month in its two-and-half year produc-tion history: Fortescue's Herb Elliott Port at Port Hedland loaded 25 vessels, including four vessels which carried over 200,000t, for a total of more than 4.3 mt of iron ore exported.rnThe result was achieved despite a week of reduced outloading caused by de-layed ship arrivals, and third- party access responsi-bilities (to Atlas Iron, which has purchased short-term loading capacity from Fortescue).
机译:西澳大利亚州的For-tescue Metals Group在9月份达到了新的出口基准,这得益于整体运营效率的提升,这使其有信心在现有的港口和铁路基础设施中实现55mtpa的运行速度。在其两年半的生产历史中,矿石的运输和出口比任何其他月份都多:Fortescue位于黑德兰港的Herb Elliott港口装载了25艘船,其中四艘运载了200,000吨,总计超过4.3吨尽管延迟了一周的到港船运量以及第三方出入责任(对阿特拉斯铁矿公司(已从Fortescue购买了短期装载能力))造成了卸货量减少,但仍取得了成果。

著录项

  • 来源
    《Bulk materials international》 |2010年第126期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号