...
首页> 外文期刊>Bulk materials international >Grab unloading here to stay
【24h】

Grab unloading here to stay

机译:在这里抢卸货

获取原文
获取原文并翻译 | 示例

摘要

Although the gradual demise of bulk ship unloading by grab was be-ing predicted in the 1990s for rea-sons of its inefficiency and environ-mental unacceptability, this cargo handling concept not only contin-ues to be widely employed but is cur-rently enjoying a renaissance thanks to recent technical advances.rnKonecranes has just won its first grab unloadcr contract from Japan. Nippon Steel has ordered a new 80t capacity/3000t/h AGD unloadcr for its Yawata works in south Japan. It will be used for discharging coal and iron ore, replacing an older design of grab-type unloader.rnThe Yawata works opted for a high-capacity grab unloader in addition to two bucket-chain type continuous ship unloaders that are also employed for unloading iron ore and coal.
机译:尽管1990年代由于散装船效率低下和环境不可接受的原因而预测散装船逐渐消亡,但这种货物装卸概念不仅继续被广泛采用,而且目前正在广泛使用rnKonecranes刚从日本获得了第一份抓斗卸载合同,这要归功于最近的技术进步。新日铁为其在日本南部的八w工厂订购了新的80t / 3000t / h AGD卸货机。 Yawata工厂选择了大容量的抓斗卸料器,此外还使用了两个铲斗式连续船卸料器,这些卸船器也用于卸铁,Yawata工厂选择了大容量抓斗卸料器。矿石和煤炭。

著录项

  • 来源
    《Bulk materials international》 |2010年第126期|p.15-17|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号